تخطى للمحتوى

نبذة عني

Results-oriented Land Surveyor | Infrastructure & Mega Bridge Projects Specialist | Civil 3D & Total Station Expert
I am a specialized Land Surveyor with over 5 years of hands-on experience in the construction and infrastructure sectors, with a proven track record in executing high-budget mega bridge projects (valued up to 1.6B EGP). My expertise lies in delivering high-precision surveying solutions that ensure structural accuracy and seamless project delivery.
Core Expertise:
Bridge Construction: Expert in survey control establishment, axis alignment, bearing positioning, and precast girder erection.
Technical Proficiency: Advanced user of Total Station, Level, AutoCAD, and Autodesk Civil 3D for alignments, profiles, and quantity calculations.
Project Leadership: Skilled in simplifying complex surveying processes for clear, efficient on-site execution and team coordination.
I have successfully managed surveying operations for numerous large-scale projects, including bridge intersections and frames in New Alamein City and Alexandria. I am committed to technical excellence, continuous professional growth, and ensuring the highest quality standards in every project I undertake.
Let’s connect to discuss surveying innovations or potential collaborations in mega construction projects!

شوف المزيد اطوِها

التوثيق

مساح / فني مساحة — موثّق من إدارة الموقع ✓ · Land surveyor

الخبرات العملية

General Surveyor
Almotaheda in MMG · دوام كامل2022 · New Alamein City

General Surveyor | Almotaheda – MMG | 2022 – PresentrnWorking as a General Surveyor on major bridge and infrastructure projects, responsible for surveying, setting out axes and structural elements, checking levels and dimensions, and ensuring accurate site execution according to approved drawings.

Land Surveyor General Surveyor Surveying

التعليم

Ideal Institute Assyut University
فني مساحة2019 — 2021

الأجهزة المساحية

Total station خبيرLevel خبيرGNSS متوسط

البرامج

Civil 3D متوسط

اللغات

English متوسط

مشاريع خارج الموقع

Bridge 4, Red Port, New Alamein City
General surveying, setting out, axis alignment, leveling, and dimensional checks for bridge construction works.2022/2023

It consists of 7 frames, with an area of 250 square meters, and the cost of the bridge ranges between 480 million Egyptian pounds.

Bridge (B) in Alexandria
General surveying, setting out, axis alignment, leveling, and dimensional checks for bridge construction works.2023/2024

It consists of 14 frames, with an area of approximately 600 square meters, and a project value of approximately EGP 1 billion.

Umm Zeghio Bridge Intersection in Alexandria
General surveying, setting out, axis alignment, leveling, and dimensional checks for bridge construction works.2024/2025

It consists of 17 frames, with an area of ​​1 km. The cost of the bridge ranges between 1.6 billion Egyptian pounds.

Bridge 5, Red Port, New Alamein City
General surveying, setting out, axis alignment, leveling, and dimensional checks for bridge construction works.2025/2025

it consists of 8 frames, with an area of 300 square meters, and the cost of the bridge ranges between 550 million Egyptian pounds.

Bahig in Burj Al Arab City
General surveying, setting out, axis alignment, leveling, and dimensional checks for bridge construction works.2025/Present

It consists of 15 frames, with an area of 900 square meters, and the cost of the bridge ranges .between 800 Million Egyptian pounds

معلومات التواصل

📞 01020590283 واتساب: 01202817358 لينكدان ↗
ثبّت Survey Tricks على موبايلك يفتح زي التطبيق، والأدوات الهندسية تحسب من غير نت. من سفاري: دوس مشاركة ⬆إضافة إلى الشاشة الرئيسية.